Upsilon develops plastic and metal tooling for telescoping products, from design through production, in 30–45 days, and the tooling you pay for is 100% yours. Often you need less tooling than you think: tubes come in 100+ stock sizes, and many common parts are ready-made.
30-45days
Tooling lead time
100%
Tooling owned by you
100,000+
Typical tooling life, in shots
Do You Need Tooling?
Tooling is an investment. First, see which parts of your product do not need it.
Usually no tooling
Common parts
We invest in development every year and keep a large range of ready-made plastic and metal parts: clips, locking parts, screws, soft and hard grips.
Tooling needed
Your own designed parts
Such as a signature clamp head, mount or grip shape. These parts define how your product looks, and they deserve their own tooling.
Tooling Process
Confirm the direction first, then cut tooling, so nothing is wasted.
01
Test the telescoping part
Build it with stock tubes and ready-made parts to confirm feel and structure.
02
3D-print to check the look
To check the look and overall fit first, we 3D-print the parts and fit them, in about 5–7 days.
Optional
03
Approve the sample
We cut tooling only after you confirm the direction.
04
Cut the tooling
Tooling takes 30–45 days.
05
Assemble, test, ship samples
New parts are fitted to the tubes and the complete pole is sent to you for testing and inspection.
Two Things That Matter Most
Your tooling, your property
Tooling you pay for is 100% yours and can be transferred whenever you ask. During production we store and maintain it, so reorders go straight to production with no new tooling. All of this is written into the agreement.
Never made for a competitor
Your dedicated tooling is never used for anyone else, and your design never appears in another brand’s product. We protect your intellectual property strictly.
Typical tooling life is 100,000 shots or more, depending on the tooling type. For high-volume products, we review the tooling specification with you before cutting.
Frequently Asked Questions
Every piece inspected
6 inspection steps, 100% inspection, no sampling
SMETA 4-Pillar audited
Audited every year since 2019
Reply in 6–10 hours
Solution and quote within 24–48 working hours
Five things we need for a tooling review
Part drawing or reference image
Material: plastic or metal
Estimated annual volume
Matching tubes: diameter or product drawing
Look: color, texture, logo
Missing a few? That's fine. Send drawings, sketches or a reference sample along with what you have.