Upsilon makes telescoping samples in the same material and process as production, in 7–10 days, so you test real tube quality, tolerance, finish and feel. Small-batch testing builds on Bare Telescoping Tubing with no MOQ: test, finalize, then produce.
7-10days
Telescoping tube samples
5-7days
3D-printed parts
3-5days
CNC part samples
No MOQ
Small-batch testing
From Sample to Production
No tooling before the direction is settled, no production before the sample is approved.
01
Share the brief
Application and length; drawings if you have them, or just an idea.
02
Sample
Telescoping tubes in 7–10 days, production material and process.
03
Test batch
Bare tubing with your parts, no MOQ.
04
Tooling
Only for parts you design yourself: 30–45 days.
If needed
05
Pre-production sample
Confirm logo position, color, process and feel.
06
Production
Bare tubing 15–20 days; other formats 30–45 days.
Three No-MOQ Test Paths
All three build on Bare Telescoping Tubing. Test, confirm the final version, then produce.
3D-printed parts of any material are only for a temporary look and rough feel; they don’t hold up to prolonged use.
Tube + 3D-printed parts
Plastic or metal 3D printing in about 5–7 days, for look and rough feel.
Frequently Asked Questions
Every piece inspected
6 inspection steps, 100% inspection, no sampling
SMETA 4-Pillar audited
Audited every year since 2019
Reply in 6–10 hours
Solution and quote within 24–48 working hours
Five things we need for a sample
Application: how and where it is used
Length: extended and collapsed length, or number of sections
What you have: drawings, a sketch, a reference sample, or just an idea
What to test: look, feel, strength or fit
Expected production volume
Missing a few? That's fine. Send drawings, sketches or a reference sample along with what you have.