top of page

Resources · FAQ
The questions buyers ask most
Upsilon's FAQ gathers the questions from across the site by topic, 41 in all, with every answer matching what each page says.
Have another question?
Ask us directly. First reply within 6–10 hours; solution and quote within 24–48 working hours.
WhatsApp: +86 183 5023 6815
Email: dora.l@upsiloncx.com
Company & factory
Upsilon is a custom telescoping tube and pole manufacturer founded in Taiwan in 1985, offering one-stop OEM/ODM service: application review, precision manufacturing, assembly, inspection and worldwide delivery. We export to 30+ countries and regions across North America, Europe and East Asia.
Upsilon is a manufacturing brand with its own factories: the core factory and R&D center are in Zhangzhou, next to Xiamen, and stainless, aluminum and brass tube comes from our own tube mills. Tube making, tube processing, assembly and 100% inspection all happen in our own plants.
The core factory covers about 20,000 m², including about 10,000 m² of new automated workshop from Factory 4.0. Each year we make about 6 million finished products and about 60 million telescoping sections, plus about 10 million small metal parts.
The core factory is in Jiaomei, Zhangzhou, Fujian, about 40 minutes by car from Xiamen Xiang'an International Airport, about 10 minutes from Jiaomei high-speed rail station and about 20 minutes from Xiamen North station. On-site, third-party and video audits are welcome by appointment, and we can pick you up.
We work in English throughout. Dora Lin, Director of International Business, leads your project from the first email to shipment; an account manager handles day-to-day follow-up, and the engineering and logistics teams join once the solution is confirmed.
Formats & MOQ
n how complete they are: bare tubing is the telescoping tube itself, with lock and force set; semi-finished adds the grip, end cap and connectors; finished adds the function head, ready to use; retail-ready adds individual retail packaging, shelf-ready on arrival.
3,000 pcs per SKU for semi-finished, finished and retail-ready, with no mixing; no MOQ for bare telescoping tubing; 1,000 pcs per SKU for carbon fiber.
Yes. Fit your own parts to bare tubing for testing, with no MOQ; 3D-printed or CNC parts can be tested alongside.
No. Upsilon makes mechanical telescoping only, using clips and locking structures to extend and hold position; hydraulic and pneumatic are not supported.
Materials & profiles
Stainless steel (201, 304, 316, 316L), aluminum (6063, 6005, 6061), brass (H65) and carbon fiber (full carbon, hybrid, fiberglass). Stainless, aluminum and brass come from our own tube mills.
Aluminum Ø7–52 mm, stainless and brass Ø2.8–23 mm, with 100+ stock diameters; carbon fiber is mostly custom, plus 4 stock series.
For long-term seawater and salt spray, choose 316 or 316L stainless, or anodized aluminum with a marine-grade finish; for general outdoor use, anodized aluminum or 304 stainless is enough.
For more stock sizes, color and lower cost, choose aluminum; when weight is the key selling point, choose carbon fiber, lighter and stiffer at the same length, made to each project.
Yes. Carbon fiber conducts like metal; for products used near power lines, tell us before development.
Grooved tube keeps inner and outer tubes aligned so they do not rotate when extended; eccentric tube locks with a twist of the tube, with no visible lock; fluted tube adds vertical ribs to the wall, stronger at the same weight.
Locks, force & load
Five: friction-fit, twist lock, external twist lock, push-button lock and flip lock. Frequent adjustment: flip lock. Turned or pushed hard: external twist lock. Appearance first: twist lock. A few fixed lengths: push-button lock. Light loads and quick adjustment: friction-fit.
Not a lock but a safety baseline on every unit: rolled grooves, dimples or crimped edges are formed into the tube, so sections stop firmly at full extension and the ends stay smooth when collapsed.
Yes, from about 500 to 3,000 g for the whole pole, aluminum from about 800 g; each extra section adds about 200–300 g. No numbers needed: describe the use and we tune it at the sample stage.
Locked, it withstands about 20–30 kg of pull along the shaft and carries about 20–80 kg axially, depending on material, diameter and lock; weight hung from a horizontal pole depends directly on length and is tested per project.
We have made ball retrievers that extend past 20 ft and bulb changer poles up to five stories. Collapsed length is worked back from your storage space to section length and count.
Yes. Aluminum poles can be made buoyant, with buoyancy from the internal parts and structure, so they float whatever the section count.
Design, samples & tooling
Yes. Tell us the use, extended and collapsed lengths and target price; our engineers work back to the structure and draw it, usually aligning the design with you in 2–3 days. The engineering review is free.
Telescoping samples in stock diameters take 7–10 days, in production material and process; CNC part samples take about 3–5 days. Samples are charged and credited against your order; freight is extra.
Yes. Plastic or metal 3D prints take about 5–7 days, including soft TPU parts, good for checking appearance and rough feel first; production parts are tooled or CNC-machined.
Only for visible parts of your own design, such as a dedicated clamp head or grip shape; tubes come in 100+ stock diameters and common parts are ready-made. Tooling takes 30–45 days.
Whoever pays for it owns it, and it can be transferred at any time. We number, file, store and maintain it, and repeat orders run on the original tooling.
Yes. 9 finishes and 5 logo processes; anodized aluminum has three stock colors, natural, black and gold, and other colors are matched as closely as possible to your Pantone code and confirmed on the pre-production sample.
Quality & testing
Every unit, no sampling. There are 6 inspection gates from incoming material to shipment, and records for every order trace any issue to a batch and step.
Standard tests include pull-out, axial load, destructive, telescoping force, telescoping cycles and salt spray (ASTM B117 / ISO 9227); test items and counts can also be set to your specification.
Our telescoping cycle test runs about 7 cycles per minute, up to about 100,000 cycles; phosphor bronze clips keep their original feel through repeated use.
Yes. We work with SGS, BV, Intertek or your own inspector for pre-shipment inspection, with an agreed AQL standard.
Lead time, packaging & shipping
Lead time, packaging & shipping
From order confirmation: bare tubing 15–20 days; semi-finished, finished and retail-ready 30–45 days, excluding international freight and year-round; new tooling adds 30–45 days.
Yes. Boxes, hang cards, barcodes and multilingual instructions: you provide the content and design, we produce, print and pack; RFID/EPC tags go on the hang card or package.
Yes. Your other suppliers deliver parts and packaging to our factory; we inspect them to your standard, assemble or kit them with the telescoping products, and load one container.
Yes. We ship in batches on your schedule, or directly to your distributors in each market.
FOB Xiamen in USD by default, with EXW, CIF and DDP negotiable; sea or air freight; we calculate 20 ft, 40 ft and 40 ft HQ container loads and can ship palletized.
From order confirmation: bare tubing 15–20 days; semi-finished, finished and retail-ready 30–45 days, excluding international freight and year-round; new tooling adds 30–45 days.
Yes. Boxes, hang cards, barcodes and multilingual instructions: you provide the content and design, we produce, print and pack; RFID/EPC tags go on the hang card or package.
Yes. Your other suppliers deliver parts and packaging to our factory; we inspect them to your standard, assemble or kit them with the telescoping products, and load one container.
Yes. We ship in batches on your schedule, or directly to your distributors in each market.
FOB Xiamen in USD by default, with EXW, CIF and DDP negotiable; sea or air freight; we calculate 20 ft, 40 ft and 40 ft HQ container loads and can ship palletized.
Audits, compliance & confidentiality
Upsilon's core factory is SMETA 4-Pillar audited (labor, health and safety, environment, business ethics) and re-audited every year since 2019; a Sedex number is available if needed.
Yes. Third-party testing is arranged order by order for the target market, such as California Prop 65 for the US; products that touch food can be food-contact tested, with reports on request.
Yes, before you send drawings, usually on your NDA template.
No. Your exclusive design and dedicated tooling are used only for you, never for another client.
Because we keep every client confidential. Projects on the site are anonymized, with no client names, brands or product photos, only illustrations.
100% inspection
SMETA 4-Pillar audited
Reply in 6–10 hours
bottom of page