top of page
  • How We Work · Quality Control & Testing

    Every unit inspected. No sampling.

    Upsilon quality control runs 6 inspection gates from incoming material to shipment, and every telescoping tube is inspected; key performance is verified with pull-out, load, destructive and salt spray tests, and inspection records for every order are kept and traceable.
    Blue Arrow Icon

6

inspection gates, 100%

±0.05

mm

precision-drawn wall (stainless, brass)

±0.1

mm

cut length

mm

±5

finished extended length

mm

±0.05

CNC parts

6 inspection gatesChoosing an Alloy

From incoming material to packing, every unit is checked to the inspection plan agreed with you, and each gate has an owner and a record.

01 · IQC

Incoming inspection

​Material grade, diameter and dimensions, surface condition, parts, and supplier documents.

02 · IPQC

First-article approval

The first article is confirmed before production: key dimensions, assembly, extension and locking, appearance and functional requirements.

03 · IPQC

In-process inspection

​Process parameters, assembly, dimensions, appearance and the agreed quality control points.

04 · FQC

Functional inspection

Extension, retraction, locking, release, anti-rotation, part fit and any function you specify.

05 · OQC

Packaging inspection

Product protection, quantity, barcodes, labels, carton marks and packing method.

06 · OQC

Pre-shipment inspection

Final inspection records, shipping documents and your requirements are reviewed before release.

The tests we runChoosing an Alloy

Every number says what it measures. How much a telescoping pole can carry depends on the direction of the force.

Test

What it measures

Result or notes

Pull-out test

Pulls outward along the shaft when locked, measuring the pull it withstands

About 20–30 kg, depending on material, diameter and lock

Axial load

Presses down along the shaft when locked, measuring the most the lock holds firmly

About 20–80 kg, depending on material, diameter and lock

Lateral bending

Extended to full length with a weight hung sideways

Depends directly on extended length; tested per project

Destructive testing

Load increased until the structure fails, showing where and how

Report and photos on request

Telescoping force

The force to extend and collapse, matched to the feel you set

About 500–3,000 g, customizable

Telescoping cycles

One full extension and retraction is one cycle, repeated to test the life of locks and clips

About 7 cycles per minute, up to about 100,000 cycles; or a count you specify

Salt spray test

Neutral salt spray to ASTM B117 / ISO 9227, testing the finish's corrosion resistance

Hours set by finish and your requirements; marine products also get a seawater resistance test

Every order is traceableChoosing an Alloy

Inspection records are kept for every order, so any issue traces to a specific batch and step. Each project's drawings, parameters and inspection records go into the factory database, and repeat orders are reproduced from them, even if contacts change. The workshop has practiced 6S management since 2016.

When a defect is foundChoosing an Alloy

Detect

Isolate and tag

Root cause analysis

Rework or scrap

Re-inspect

Record and file

Third-party inspection welcome
We work with SGS, BV, Intertek or your own inspector for pre-shipment inspection, with an agreed AQL standard.
Product testing by market
Prop 65, food-contact and other tests are arranged with third parties order by order for the target market.Audits & Compliance
Reports on request
Destructive testing, Prop 65, food-contact and other reports; tell us which you need when you order.

Quality and testing FAQChoosing an Alloy

100% inspection
SMETA 4-Pillar audited
Reply in 6–10 hours
bottom of page