  • How We Work · Our Process

    Start with a drawing, or with just an idea.

    Working with Upsilon starts with a free engineering review, then sample approval, tooling (if needed) and a pre-production sample, through to 100%-inspected production and shipment. At every stage we send photos or video for your approval.
    Blue Arrow Icon

6-10

hours

first reply

solution and quote, working days

24-48

hours

samples (stock diameters)

7-10

days

new tooling

days

30-45

production, year-round

days

30-45

Two starting points, one pathChoosing an Alloy

Whether you have a complete drawing or just a use case, the timeline that follows is the same.

Starting point A

You have a design: built steadily and fast

You have drawings, sketches or samples. We align the details with you, usually in 2–3 days; then every step is inspected to hold the lead time and keep every batch consistent.

​

We accept STEP, IGES, DWG and PDF, and hand sketches too.

Starting point B

You have a function and a use case: we work back to the structure together

You know where it is used and how long and short it must be, but there is no drawing yet. We work back from the user's movements to the structure, solve the sticking points together, then use stock diameters, our own tube mills and 30–45 day tooling to bring it to production quickly.

From inquiry to shipment in four stepsChoosing an Alloy

The same four steps as on the homepage, with what happens at each and how long it takes.

01

A use description, drawing, sketch or sample, any one is enough

Sign an NDA first if you need one

First reply within 6–10 hours

Send your requirements

◦

​

◦

​◦

02

Free engineering review: structure, material, lock and tolerances

Solution and quote within 24–48 working hours

From just an idea, the design is usually aligned with you in 2–3 days

Solution and quote

◦

​

◦

​

◦

03

Sample approval

Stock-diameter samples in 7–10 days: photos to approve the look first, then the sample ships

3D-printed parts in about 5–7 days; CNC part samples in about 3–5 days

New tooling in 30–45 days; tooling you pay for is yours

Pre-production sample confirms color, logo and packaging

To trial a small batch first, bare telescoping tubing has no MOQ

◦

​

 

◦

 

 

◦

​

◦

​

◦

04

30–45 days after order confirmation, bare tubing 15–20 days, year-round

Every unit passes 6 inspection gates

FOB Xiamen by default; EXW, CIF and DDP negotiable; sea or air freight

Inspection reports, certificates of origin and fumigation certificates on request

Production and shipment

◦

​

 

◦

 

◦

​

​

​◦

Sampling details and three small-batch test paths:                                                . 

When tooling is needed:                                       .

You see every stageChoosing an Alloy

You are not at the factory, yet you always know where things stand. We send photos or video at each stage and only move on once you approve.

Sample

Photographed for appearance approval first, then shipped.

Tooling

Tooling progress and trial-shot photos.

Pre-production sample

Photos or video; production starts only after your approval.

Production

Production and packing photos, and container-loading photos before shipment.

Inspection

Inspection reports on request; third-party inspection is welcome.

Who follows your project
Choosing an Alloy

Your contact stays the same from the first email to shipment; once the solution is confirmed, the engineering and logistics teams join. Channels: email, WhatsApp, WeChat; Zoom or Microsoft Teams meetings when needed, and video factory audits too.

Dora Lin · Director of International Business

Leads your project, there from the first email to shipment. Your inquiry comes straight to me.

Account manager

Day-to-day follow-up on quotes, samples, production progress and shipping, so there is always someone to reach.

Engineering team

Joins once the solution is confirmed: understands how the product is used, combines technology, design and the real user's situation into the best-fit solution, balancing cost and efficiency.

Logistics and inspection team

Arranges shipping and documents, and supports pre-shipment inspection.

Delivery and supportChoosing an Alloy

From private label and packaging to shipping, five things handled together.

Private label

Your brand, product markings, colors, finishes and private-label packaging.

Retail packaging

Boxes, inserts, instructions, barcodes, carton labels and each channel's packaging requirements; RFID tags on hang tags and packaging.

Inspection and testing

We work with your inspector or a third party, and send products to SGS, BV, Intertek or your chosen lab for testing as needed.

Shipping documents

Commercial invoice, packing list, carton details and product documents; certificates of origin and fumigation on request.

Last-mile consolidated shipping

Accessories and packaging from your other suppliers in China can be delivered straight to our factory. We inspect them to your standard and load them with the telescoping products into one container: one factory, one inspection standard, one shipment.

Our Process FAQChoosing an Alloy

100% inspection
SMETA 4-Pillar audited
Reply in 6–10 hours

Send us your idea or your drawing.

Have a drawing or a sample?

Upload drawings, photos or a sample description. We send a solution and quote within 24–48 working hours. NDA available on request.

Only have an idea?

Get the Telescoping Design Guide: six steps from an idea to a product that holds up in production. The last page is your project brief, ready to send back to us.

Dora Lin

Director of International Business

Your inquiry comes straight to me. I reply within 6–10 hours.

STEP, IGES, PDF, DWG, or a hand sketch

We reply within 6–10 hours and send a solution and quote within 24–48 working hours.