Sample first, confirm, then cut a die, greatly improving test efficiency and lowering the cost of trial and error. Prototyping in 7–10 days, using the same material and process as mass production.

upsilon-52.png

Plastic 3D-printed parts (grips, end plugs, etc.): 3–5 days

upsilon-52.png

Metal 3D-printed parts: 3–5 days

upsilon-44.png

Metal parts needing real strength and assembly precision go through CNC part prototyping,

about 3–5 days, from 1 piece

Important note: 3D-printed parts of any material are only suitable for a temporary look and rough feel;they don't hold up to prolonged use.

upsilon-36.png

Low-volume testing:
three no-MOQ paths

upsilon-53.png

Bare Telescoping Tubing, to match your own parts for testing

upsilon-61.png

Bare Telescoping Tubing + 3D-printed parts, mainly for feel and light testing

upsilon-44.png

​For more rounds of testing, Bare Telescoping Tubing + CNC parts (same material and process as production, reusable for repeated testing)

All three build on Bare Telescoping Tubing, with no MOQ.

upsilon-36.png
upsilon-54.png
upsilon-55.png

Test

confirm the final version

then mass-produce is the most economical path.

upsilon-37.png

When you actually need a die

upsilon-56.png

Tube body: 99+ ready diameters cover essentially every telescoping-tube use case, ready to produce.

upsilon-57.png

Parts: we invest in 100–200 sets of tooling each year and keep a large stock of ready, general-purpose plastic and metal parts (clips, locking parts, screws, soft/hard grips, etc.), worth checking first.

upsilon-58.png

What truly needs a die is usually the key appearance part you design yourself, such as a selfie-stick clamp, a tripod head, a product housing, brand-specific styling, and so on

​Tooling flow: first confirm no ready size/style fits → test the telescoping section with Bare Telescoping Tubing → approve the sample → cut the die (30–45 days) → assemble the tooled parts with the telescoping tube and ship to you for testing and QC

upsilon-59.png

first confirm no ready size/style fits

test the telescoping section with Bare Telescoping Tubing

upsilon-36.png

approve the sample

upsilon-54.png

cut the die (30–45 days)

upsilon-37.png

assemble the tooled parts with the telescoping tube and ship to you for testing and QC

upsilon-60.png
upsilon-38.png

Sample fee

The sample fee ranges from USD 20–200 by complexity, refundable after a formal order;
shipping is not included.

100% inspection
SMETA 4-Pillar audit
6–10 hour first response
upsilon-32.png

Finished Product FAQ

within 24–48 business hours
模糊的海灘場景
upsilon-35.png

Telescoping-tube prototyping: 7–10 days

Prototyping is essentially making your telescoping tube so you can verify it. We prototype with the same material and process as mass production, not a rough look-alike, but a real check of tube quality, tolerance, finish, and telescoping feel.

bottom of page